Tier 3 Data Center Confidential Location, Virginia
The confidential data center was a 200,000SF facility that was designed to be fitted out in two phases and contained two data halls. The capacity of each hall was 1.7MW for a total technical load of 3.4MW.
The facility was supplied by a single 34.5kV feed and Phase 1 was supported by four (4) 3MW diesel generator sets, 9MVA of UPS and 2,700 tons of cooling. The resiliency of the chilled water system was backed up by a 2.5MVA UPS system in addition to 100,000 gal. of chilled water storage .